Case Studies / Success Stories

Case Studies / Success Stories

AKTSD have a comprehensive list of case studies and letters of commendation from many clients which are available on request to new and/or existing clients wishing to review them as further proof of our experience, expertise and commitment to quality of installation, materials, schedule keeping and time and cost effectiveness. A summarized samples of clients / projects are given below :-

SL #
NAME OF PROJECT, LOCATION
& CLIENT
DESCRIPTION OF PROJECT VALUE LOCATION
1 SAUDI ARAMCO, Safaniya Gas-oil Separation Plant Year-1983 Removal of all cover to reinforcing bars. Reinforcing Bars isolated from contaminated core and coated with acrylic polymer slurry. Cover re-constructed by shotcreting and sealing membrane applied over structure. 8,000,000

Safaniya

2 Ministry of Defense and Aviation King Abdulaziz International Airport, Jeddah. Year 1984 Following investigation and material study conducted by Al-Khalifa at University of Texas, AKTSD opted to isolate the existing structure using foam sandwich. A new shell was installed internally using polymer coated rebar and acrylic modified shotcrete. 21,000,000
Jeddah
3 Tuhama Contracting Company, Riyadh Owner/ Principal C.R.S.S. JV September 1989 Royal Saudi Air Force Peace Shield Programme Rock stabilization by primary grouting and shotcreting at height up to 70 metres. This work was done under international quality control and safety procedures. 5,600,000
Al-Bahah
4 SAUDI ARAMCO, January 1992 Concrete Fireproofing to the Fin Fan Supports at Plant 444 Juaymah Stabilizer, by shotcreting. 500,000
Juaymah
5 Eastern Petrochemical Co. (SHARQ). September 1992 Foundation Repair by Shotcrete. 1,100,000
Jubail
6 Saudi European Petrochemical Co. (IBN ZAHR) January 1993 Concrete repair, Cathodic protection and Anode overlay by shotcrete to seawater Basin (Phase I) 1,700,000
Jubail
7 National Industrial Gases Co. (GAS) April 1993 Engineering, installation, testing and commissioning of Cathodic Protection System for Concrete made Seawater Pit. 1,500,000
Jubail
8 Saudi Methanol Co. (AR-RAZI) April 1993 Cathodic Protection installation of Seawater Basin (Phase II) 1,400,000
Jubail
9 Saudi Iron and Steel Co. (HADEED) May 1994 Repair of Rolling Mill Quench Water Tank by shotcreting, and application of waterproofing / Protection membrane. 302,500
Jubail
10 Saudi Iron and Steel Co. (HADEED) August 1994 Removal and replacement of existing sleepers & repair of non-sleeper concrete foundation. 1,000,000
Jubail
11 Eastern Petrochemical Co. (SHARQ). December 1994 Repair of Deteriorated reinforced concrete structure by shotcrete method. 1,500,000
Jubail
12 SAUDI ARAMCO, January 1995 Refractory repairs of Heaters 103, 301 and 812 at Yanbu Refinery by shotcrete method. 500,000
Yanbu
13 Saudi Iron and Steel Co. (HADEED) January 1995 Rectification of Main Seawater Basin by Cathodic Protection Method. 4,700,000
Jubail
14 Saudi European Petrochemical Co. (IBN ZAHR) January 1995 Cathodic Protection of Seawater Basin.
2,000,000
Jubail
15 Saudi Yanbu Petrochemical Co. (YANPET) June 1995 Cathodic Protection to Concrete Foundations.
2,200,000
Yanbu
16 Saudi Iron and Steel Co. (HADEED) September 1995 CCM Cooling Bed Concrete Repair by Shotcrete.
1,200,000
Jubail
17 National Chemical Fertilizer Co.(IBN AL-BAYTAR) Jubail December 1996 Rehabilitation for concrete structure of Seawater Basins by shotcrete method (Plant Shutdown)
2,500,000
Jubail
18 SAUDI ARAMCO, Shedgum (SFC 400473/021, 027, 028 & 029) March 1997 Tapecrete/Shotcrete Fire Protection System of Sub-Stations.
1,400,000
Shedgum
19 Eastern Petrochemical Co. (SHARQ), Jubail - May 1997 Foundation repair works by Shotcrete Method.
1,150,000
Jubail
20 Saud Consult / Real Estate Development Fund, Aziziyah. November 1997 Repair of Aziziyah Building Car Park by shotcrete method
10,000,000
Aziziyah
21 SAMREF,Yanbu (Contract # Prc-970007)November 1997 Concrete Remediation Phase-III (Oil Port Repairs) by Cathodic Protection Method.
12,000,000
Yanbu
22 Saudi Iron and Steel Co. (HADEED) P.O. # L-98/66260 - July 1998 Concrete repairs of Furnace # 1,2 & 3 and Caster # 3 by Shotcrete Method.
1,200,000
Jubail
23 Saudi Arabian Fertilizer Co. (SAFCO) P.O. # SD033908 - May 1999 Concrete repairs and protective coating of Prilling Tower at SAFCO, Dammam by Shotcrete Method.
793,000
Dammam
24 SAUDI ARAMCO, Shedgum (SFC # 400651-011) - July 2001 Repair defective fireproofing at Shedgum Gas Plant by gunite method.
466,800
Shedgum
25 SAUDI ARAMCO, Uthmaniyah (SFC # 400642-071) - July 2002 Sulphur Train # 4 & 5 External & Internal Repair by Shotcrete Method at Uthmaniyah Gas Plant.
3,458,000
Uthmaniyah
26 Sabic Services Ltd. (SHARQ) (P.O. # 4500085421) - January 2003 Civil repair works for 1EG Ponds, 1 UTL Ponds & Seawater Laterals at SHARQ by Shotcrete Method.
855,000
Jubail
27 Sabic Services Ltd. (SHARQ) (P.O. # 4500010629) - December 2003 Concrete repair work including miscellaneous civil works.
3,500,000
Jubail
28 SAUDI ARAMCO, Uthmaniyah (P.O. # 6510066020) April 2004 Refractory repair using Gunite Method of application at Sulphur Train # 4 / Uthmaniyah Gas Plant.
256,000
Uthmaniyah
29 Sabic Services Ltd. (SHARQ) (P.O. # 4500133186) - June 2004 Civil repair works for 3EG Ponds, 3UTL Ponds & Seawater Laterals at Sharq by Shotcrete Method.
490,000
Jubail
30 Sabic Services Ltd. (SHARQ) (P.O. # 4500010629) Project Completion - December 2004 Concrete repair work including miscellaneous civil works.
3,500,000
Jubail
31 Sabic Services Ltd. (SADAF) (P.O. # 4500119675) Project Completion - December 2004 Rehabilitation of the deteriorating concrete structures at all SADAF Sites, i.e. Salt Plant and Main Plant.