SL # |
NAME OF PROJECT, LOCATION
& CLIENT
|
DESCRIPTION OF PROJECT |
VALUE |
LOCATION |
1 |
SAUDI ARAMCO, Safaniya Gas-oil Separation Plant Year-1983 |
Removal of all cover to reinforcing bars. Reinforcing Bars isolated from contaminated core and coated with acrylic polymer slurry. Cover re-constructed by shotcreting and sealing membrane applied over structure. |
8,000,000 |
|
2 |
Ministry of Defense and Aviation King Abdulaziz International Airport, Jeddah. Year 1984 |
Following investigation and material study conducted by Al-Khalifa at University of Texas, AKTSD opted to isolate the existing structure using foam sandwich. A new shell was installed internally using polymer coated rebar and acrylic modified shotcrete. |
21,000,000 |
Jeddah
|
3 |
Tuhama Contracting Company, Riyadh Owner/ Principal C.R.S.S. JV September 1989 |
Royal Saudi Air Force Peace Shield Programme Rock stabilization by primary grouting and shotcreting at height up to 70 metres. This work was done under international quality control and safety procedures. |
5,600,000 |
Al-Bahah
|
4 |
SAUDI ARAMCO, January 1992 |
Concrete Fireproofing to the Fin Fan Supports at Plant 444 Juaymah Stabilizer, by shotcreting. |
500,000 |
Juaymah
|
5 |
Eastern Petrochemical Co. (SHARQ). September 1992 |
Foundation Repair by Shotcrete. |
1,100,000 |
Jubail
|
6 |
Saudi European Petrochemical Co. (IBN ZAHR) January 1993 |
Concrete repair, Cathodic protection and Anode overlay by shotcrete to seawater Basin (Phase I) |
1,700,000 |
Jubail
|
7 |
National Industrial Gases Co. (GAS) April 1993 |
Engineering, installation, testing and commissioning of Cathodic Protection System for Concrete made Seawater Pit. |
1,500,000 |
Jubail
|
8 |
Saudi Methanol Co. (AR-RAZI) April 1993 |
Cathodic Protection installation of Seawater Basin (Phase II) |
1,400,000 |
Jubail
|
9 |
Saudi Iron and Steel Co. (HADEED) May 1994 |
Repair of Rolling Mill Quench Water Tank by shotcreting, and application of waterproofing / Protection membrane. |
302,500 |
Jubail
|
10 |
Saudi Iron and Steel Co. (HADEED) August 1994 |
Removal and replacement of existing sleepers & repair of non-sleeper concrete foundation. |
1,000,000 |
Jubail
|
11 |
Eastern Petrochemical Co. (SHARQ). December 1994 |
Repair of Deteriorated reinforced concrete structure by shotcrete method. |
1,500,000 |
Jubail
|
12 |
SAUDI ARAMCO, January 1995 |
Refractory repairs of Heaters 103, 301 and 812 at Yanbu Refinery by shotcrete method. |
500,000 |
Yanbu
|
13 |
Saudi Iron and Steel Co. (HADEED) January 1995 |
Rectification of Main Seawater Basin by Cathodic Protection Method. |
4,700,000 |
Jubail
|
14 |
Saudi European Petrochemical Co. (IBN ZAHR) January 1995 |
Cathodic Protection of Seawater Basin. |
2,000,000
|
Jubail
|
15 |
Saudi Yanbu Petrochemical Co. (YANPET) June 1995 |
Cathodic Protection to Concrete Foundations. |
2,200,000
|
Yanbu
|
16 |
Saudi Iron and Steel Co. (HADEED) September 1995 |
CCM Cooling Bed Concrete Repair by Shotcrete. |
1,200,000
|
Jubail
|
17 |
National Chemical Fertilizer Co.(IBN AL-BAYTAR) Jubail December 1996 |
Rehabilitation for concrete structure of Seawater Basins by shotcrete method (Plant Shutdown) |
2,500,000
|
Jubail
|
18 |
SAUDI ARAMCO, Shedgum (SFC 400473/021, 027, 028 & 029) March 1997 |
Tapecrete/Shotcrete Fire Protection System of Sub-Stations. |
1,400,000
|
Shedgum
|
19 |
Eastern Petrochemical Co. (SHARQ), Jubail - May 1997 |
Foundation repair works by Shotcrete Method. |
1,150,000
|
Jubail
|
20 |
Saud Consult / Real Estate Development Fund, Aziziyah. November 1997 |
Repair of Aziziyah Building Car Park by shotcrete method |
10,000,000
|
Aziziyah
|
21 |
SAMREF,Yanbu (Contract # Prc-970007)November 1997 |
Concrete Remediation Phase-III (Oil Port Repairs) by Cathodic Protection Method. |
12,000,000
|
Yanbu
|
22 |
Saudi Iron and Steel Co. (HADEED) P.O. # L-98/66260 - July 1998 |
Concrete repairs of Furnace # 1,2 & 3 and Caster # 3 by Shotcrete Method. |
1,200,000
|
Jubail
|
23 |
Saudi Arabian Fertilizer Co. (SAFCO) P.O. # SD033908 - May 1999 |
Concrete repairs and protective coating of Prilling Tower at SAFCO, Dammam by Shotcrete Method. |
793,000
|
Dammam
|
24 |
SAUDI ARAMCO, Shedgum (SFC # 400651-011) - July 2001 |
Repair defective fireproofing at Shedgum Gas Plant by gunite method. |
466,800
|
Shedgum
|
25 |
SAUDI ARAMCO, Uthmaniyah (SFC # 400642-071) - July 2002 |
Sulphur Train # 4 & 5 External & Internal Repair by Shotcrete Method at Uthmaniyah Gas Plant. |
3,458,000
|
Uthmaniyah
|
26 |
Sabic Services Ltd. (SHARQ) (P.O. # 4500085421) - January 2003 |
Civil repair works for 1EG Ponds, 1 UTL Ponds & Seawater Laterals at SHARQ by Shotcrete Method. |
855,000
|
Jubail
|
27 |
Sabic Services Ltd. (SHARQ) (P.O. # 4500010629) - December 2003 |
Concrete repair work including miscellaneous civil works. |
3,500,000
|
Jubail
|
28 |
SAUDI ARAMCO, Uthmaniyah (P.O. # 6510066020) April 2004 |
Refractory repair using Gunite Method of application at Sulphur Train # 4 / Uthmaniyah Gas Plant. |
256,000
|
Uthmaniyah
|
29 |
Sabic Services Ltd. (SHARQ) (P.O. # 4500133186) - June 2004 |
Civil repair works for 3EG Ponds, 3UTL Ponds & Seawater Laterals at Sharq by Shotcrete Method. |
490,000
|
Jubail
|
30 |
Sabic Services Ltd. (SHARQ) (P.O. # 4500010629) Project Completion - December 2004 |
Concrete repair work including miscellaneous civil works. |
3,500,000
|
Jubail
|
31 |
Sabic Services Ltd. (SADAF) (P.O. # 4500119675) Project Completion - December 2004 |
Rehabilitation of the deteriorating concrete structures at all SADAF Sites, i.e. Salt Plant and Main Plant. |